Point Cook Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

New Construction Stage Inspections in Point Cook

Seven points on a Point Cook build where work is about to be covered. We attend before that, and we check the structural items against the engineering drawings rather than against a checklist.

  • One stage or all seven
  • Attended before the covering trade
  • Checked against your engineering drawings
  • Report same or next day
  • Structural items flagged separately
  • Return visits for unresolved work
  • AS 2870 and AS 1684 cited
  • Fitted to the build program
Price a Point Cook inspectionAbout a minute, with nothing committed.

Fully licensed & accredited

The Point Cook build stages we inspect

Point Cook frames have produced tie-down bolts drawn on the engineering and never fitted, beam connections that do not match the detail, and bracing missing outright. Those are drawing-versus-reality problems, and only a drawing catches them.

Frame inspection in Point Cook

Frame

Once frame and trusses are up and the roof is on, before sarking

M10 and M12 tie-down bolts at the nominated locations, beam connections against the engineering detail, bracing present, plywood fixing and nail spacing, slab level

Learn more about the frame inspection →
Sample findings

Sample defects recorded during our construction stage inspections in Point Cook

One finding from each stage of a Point Cook build, in the inspector's words.

Vapour barrier lying over the steel rather than beneath it, recorded during a slab pre-pour inspection in Point Cook
Vapour barrier lying over the steel rather than beneath it
Tie-down bolts drawn on the engineering and not installed, recorded during a frame inspection in Point Cook
Tie-down bolts drawn on the engineering and not installed
Bracing cut through, losing the stability it provides, recorded during a lock-up inspection in Point Cook
Bracing cut through, losing the stability it provides
Waterproof membrane bare and starved in many sections, recorded during a waterproofing inspection in Point Cook
Waterproof membrane bare and starved in many sections
Box gutter overflow not discharging to the atmosphere, recorded during a fixing inspection in Point Cook
Box gutter overflow not discharging to the atmosphere
Balcony balustrade loose and unsecured, recorded during a pre-handover inspection in Point Cook
Balcony balustrade loose and unsecured
Beam connection and support not matching the engineering, recorded during a frame inspection in Point Cook
Beam connection and support not matching the engineering
Owner Inspections inspectors at the Melbourne office
Why Point Cook owners choose us

Independent. Licensed. Insured.

  • The inspector who walks your Point Cook site writes and signs the report.
  • Structural findings are checked against the engineering drawings, not a generic checklist.
  • Point Cook is established enough that we inspect resales as often as new builds.
  • You keep the inspector's number for the length of the job.
Guides

New Construction Stage Inspections guides for Point Cook

All guides →

Book new construction stage inspections in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

New Construction Stage Inspections in Point Cook: common questions

Which Point Cook stage matters most?

Frame, without much competition. Every serious structural finding we have recorded here sits at frame: missing tie-down bolts, beam connections that do not match the engineering, and bracing left out.

How do you know a bolt is missing?

Because it is drawn. The engineering nominates M10 or M12 tie-down bolts at specific locations, and we check the locations rather than form an impression of the frame.

What is outside a stage inspection?

We work visually and by hand. Electrical is not energised or tested, plumbing is not pressure tested, nothing is opened destructively, no engineering is certified and no soil is sampled.

CallGet a Free Quote