Cladding, roof and doors are on and the plasterer is next. This is the last look at anything structural behind the lining.
Lock-up in Point Cook catches damage done after the frame passed: bracing cut through by a following trade, posi-strut top chords cut, and ducting bent and unsupported.

Annotated findings from Lock-up (pre-plaster) inspections on Point Cook builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, with steel and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
5FixingAfter mouldings, doors and joinery, before painting
6WaterproofingAfter the membrane is applied and cured, before tiling
7Pre-handover (PCI)About a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
A following trade runs a service through it. Bracing provides stability and cutting it removes that, which is why the lock-up check matters even when the frame passed.
A truss or floor system with an open web. Cutting a top chord changes how it carries load, and the manufacturer has to specify the repair.
A tightly bent or unsupported duct restricts airflow, so the system underperforms from the day you move in.
After external doors are hung and before plaster arrives.
Yes, the two names describe one point in the build.
Easily, which is why the timing matters.