The inspection before keys change hands, written up as a numbered list while the builder still carries the cost of putting things right.
A Point Cook pre-handover inspection is assessed against your contract and selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.
0 checkpoints across 0 areas on a standard Point Cook pre-handover (PCI) inspection. Whatever is locked, sealed or buried under stored goods on the day goes in as not inspected. Unreachable work is never marked satisfactory.
From Point Cook practical completion reports.










New Construction Stage Inspections Seven checks through a Point Cook build, with the structural items measured against your engineering drawings.
Pre-Purchase Building Inspections A settled Point Cook home assessed under AS 4349.1, with movement measured rather than described.
Building and Pest Inspections Building and timber pest together, looking as hard at the ground around the house as at the house.
Defect Investigation Reports Measuring what failed against what the engineering required, so the argument moves onto the drawing. Instant online pricing, or talk to the booking team on 1300 471 805.
About a week, so the list is with your builder before you are asked to sign anything.
Yes. A balcony balustrade that is not properly secured is a fall hazard, and it is recorded as a safety item rather than a finishing one.
Circuits are not energised, plumbing is not pressure tested, heating and cooling are not commissioned, appliances and automatic garage door safety systems are not tested, and concealed or obstructed areas are not inspected.