Point Cook Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Frame inspection in Point Cook

The frame is where a Point Cook build is checked against its own engineering drawings rather than against a general impression.

  • Once frame and trusses are up and the roof is on, before sarking
  • 1 to 2 hours on site
  • Report within 24 hours
Price a Point Cook inspectionAbout a minute, with nothing committed.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before sarking
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Point Cook frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Point Cook builds

Every serious structural finding we have recorded in Point Cook sits at frame, and each is a drawing comparison: M10 and M12 tie-down bolts shown and not fitted, beam connections not matching the detail, bracing left out entirely.

What we find at this stage in Point Cook

  • M10 and M12 tie-down bolts shown on the engineering and not installed
  • Beam connection and support not matching the engineering
  • Bracing shown on the plans not installed
  • Plywood fixing missed to a stud, with nail spacing out
  • Slab deviating from level beyond tolerance
  • Concrete recess penetrating under the wall frame
Slab deviating from level beyond the tolerance, Point Cook
Slab deviating from level beyond the tolerance
Scyon sheet layout not following the manufacturer's installation manual, Point Cook
Scyon sheet layout not following the manufacturer's installation manual
Sample findings

Sample defects found during our frame inspections in Point Cook

Annotated findings from Frame inspections on Point Cook builds. Client addresses withheld.

Tie-down bolts shown on the engineering and not installed, recorded during a frame inspection in Point Cook
Tie-down bolts shown on the engineering and not installed
Beam connection and support not matching the engineering, recorded during a frame inspection in Point Cook
Beam connection and support not matching the engineering
Bracing shown on the engineering plans not installed, recorded during a frame inspection in Point Cook
Bracing shown on the engineering plans not installed
Plywood fixing missed to a stud, with nail spacing out, recorded during a frame inspection in Point Cook
Plywood fixing missed to a stud, with nail spacing out

The other stages of a Point Cook build

  1. Bored piers inspection in Point Cook1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Point Cook2Slab pre-pourThe day before the pour, with steel and formwork open
  3. Lock-up (pre-plaster) inspection in Point Cook4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Point Cook5FixingAfter mouldings, doors and joinery, before painting
  5. Waterproofing inspection in Point Cook6WaterproofingAfter the membrane is applied and cured, before tiling
  6. Pre-handover (PCI) inspection in Point Cook7Pre-handover (PCI)About a week before practical completion

All construction stage inspections in Point Cook →

Guides

Construction stage guides for Point Cook

All guides →

Book a frame inspection in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Point Cook: common questions

Why is frame the critical stage here?

Because Point Cook's serious findings are all drawing comparisons, and after sarking and plaster nobody can compare anything to a drawing again.

How can a bolt just be missing?

The engineering nominates tie-down bolts at specific points. If nobody checks those points against the drawing, an omission passes unnoticed and gets covered.

What does a beam connection not matching mean?

The connection built is not the connection detailed. It may carry less load than the design assumed, which is why it is reported as structural rather than cosmetic.

Do you check the trusses?

Support, fixings and bracing are what we assess. Design certification for the trusses comes from the fabricator.

Which standards?

AS 1684 for framing and AS 4055 for wind classification, alongside your engineering.

Visible later?

Not without opening the wall.

CallGet a Free Quote