When something has failed and your builder will not accept it, we investigate, measure it, and set out what the engineering or the standard actually required.
A defect investigation is assessed against the engineering for your lot, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 2870 for slabs, AS 3700 for masonry and AS 3740 for wet areas.
0 checkpoints across 0 areas on a standard Point Cook defect investigation report. Whatever is locked, sealed or buried under stored goods on the day goes in as not inspected. Unreachable work is never marked satisfactory.
New Construction Stage Inspections Seven checks through a Point Cook build, with the structural items measured against your engineering drawings.
Pre-Handover (PCI) Inspections The inspection before keys, where the safety items get chased hardest.
Pre-Purchase Building Inspections A settled Point Cook home assessed under AS 4349.1, with movement measured rather than described.
Building and Pest Inspections Building and timber pest together, looking as hard at the ground around the house as at the house. Instant online pricing, or talk to the booking team on 1300 471 805.
No. An investigation report is prepared for you and your builder. The Building and Plumbing Commission dispute service and VCAT need an expert witness report drawn to the VCAT practice note, which we prepare separately.
Nothing is opened up destructively, no engineering is certified, no ground is sampled and no repairs are carried out. Where an engineer is required the report says so.
We publish photographs only from the service and the area they belong to. We have not carried out an investigation report in the Wyndham corridor that we can show here, and using images from a different kind of inspection would misrepresent the work. The scope and method above are what the service covers.