Point Cook Building
Inspections

Slab movement in twenty year old Point Cook homes

Measured, not estimated.

Owner Inspections · Point Cook 3030 · 2026-03-03

In short: A 25mm deviation is a number. What it means depends on the pattern and the ground.

What we measured

A deviation of 25mm across a Point Cook floor, recorded during a pre-purchase inspection.

Why measuring matters

A sloping floor is easy to feel and impossible to argue about once it is measured.

What causes it

Ground movement, and in Point Cook the ground is not one thing. Basalt clay, swamp deposits and sand all behave differently.

What it does not tell you

Whether it is still moving. That needs monitoring or an engineer.

What to do with it

Price it, or get an engineering opinion before you commit.

Written by the Owner Inspections team from inspections carried out in Point Cook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pre-purchase guides for Point Cook

All guides →

Book a building inspection in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Point Cook owners ask about this

Is 25mm a lot?

It is measurable and worth understanding. Significance depends on pattern and cause.

Does it mean structural failure?

Not on its own.

Can you tell if it is ongoing?

Not from one visit.

Should it stop a purchase?

Not automatically. It ought to shape both your offer and what you ask next.

CallGet a Free Quote